OUR WORK MATTERS.

Portfolio

CITYWIDE DEVELOPMENT TECH TOWN BUILDING G

Other

CITYWIDE DEVELOPMENT TECH TOWN BUILDING G

Shook Construction, in conjunction with a minority joint venture partner, provided construction services for the new three-story, 65,000 SF building, which is the second in a series for the Tech Town development and is anticipated to bring as many as 300 new jobs to downtown Dayton.
Client CityWide
Location Dayton, OH
Square Footage 65,000.00
Project Budget $9 Million
DHL ADMINISTRATIVE BUILDING

Other

DHL ADMINISTRATIVE BUILDING

The DHL Air Hub Administration Addition Project consisted of a 50,000 SF, two-story addition to the original administration building. The air hub and administration building had to remain operational throughout the construction process with minimal disruption to the employees and the business at hand.
Client DHL Express
Location Wilmington, OH
Square Footage 50,000.00
Project Budget $10.5 Million
DAYTON METRO LIBRARY SOUTHEAST

Other

DAYTON METRO LIBRARY SOUTHEAST

The Southeast branch includes the construction of one new 24,400 SF one-story building being constructed from November 2017 to September 2018. The facility features technology room and technology upgrades, group study rooms, community meeting room, new family restroom, enclosed adult reading room and more.
Client Dayton Metro Library
Location Dayton, OH
Square Footage 24,000.00
Project Budget $7.4 Million
DAYTON METRO LIBRARY MIAMISBURG

Other

DAYTON METRO LIBRARY MIAMISBURG

The Miamisburg branch included the construction of one new 16,147 SF one-story building constructed from March 2016 to January 2017. The facility features a theater room, historical collection area, 3-D printing station, outdoor patio, group study rooms, technology upgrades and more.
Client Dayton Metro Library
Location Miamisburg, OH
Square Footage 16,147.00
Project Budget $5.1 Million
DAYTON METRO LIBRARY VANDALIA

Other

DAYTON METRO LIBRARY VANDALIA

The Vandalia branch included the construction of a new 19,465 SF one-story building constructed from October 2015 to September 2016. The facility features navigation themed children’s area, 3-D printing station, group study rooms, updated landscaping, technology upgrades and more.
Client Dayton Metro Library
Location Vandalia, OH
Square Footage 19,465.00
Project Budget $5.6 Million
DAYTON METRO LIBRARY KETTERING-MORAINE

Other

DAYTON METRO LIBRARY KETTERING-MORAINE

The Kettering-Moraine branch included the renovation of one 13,090 SF one-story building from November 2015 to September 2016. The facility features new driveway, outdoor reading terrace, group study rooms, technology upgrades, updated landscaping, new family restroom and more.
Client Dayton Metro Library
Location Kettering, OH
Square Footage 13,090.00
Project Budget $4.4 Million

SAFETY

SAFELY, THE ONLY WAY TO WORK

Safety is the most important value in our company. It impacts everything we do and is the first consideration when we plan our work. Our motto says it all: Safely, the only way to work. Our entire team is passionate about ensuring that everyone onsite works safely and can return home at night.

Our award-winning safety program is designed to provide zero incidents, as well as a safe and healthy work environment for all of our employees, subcontractors and the general public. Our goal on every job is to ensure that all work is completed safely with appropriate tools, equipment and methods. This goal takes priority over project scheduling concerns.

Safety Icon